Short version: in Florida, moving or adding plumbing, electrical, or structural work generally needs a permit; cosmetic swaps often do not. The details vary by county — Miami-Dade is stricter than most — so treat this as the map, not the territory.
Usually needs a permit
Moving a toilet or shower drain. Adding or moving electrical (new circuits for a tub, relocated switches). Structural changes like widening a doorway in a load-bearing wall. Converting a tub to a shower with new plumbing rough-in. If we are opening walls and touching systems, assume a permit.
Usually does not
Direct fixture swaps (toilet for toilet, same spot). Grab bar installation. Showerhead swaps. Floor replacement with no plumbing changes. Painting and cosmetic updates. When in doubt, we check with the county before starting — that is part of the job.
Who handles it
We do. Permits are the contractor's job, not yours: we prepare the paperwork, submit to the county, schedule inspections, and keep you posted. It is baked into our written price — never a surprise add-on. If a contractor tells you permits are "not needed" for work that clearly needs them, that is a red flag (see our vetting guide).
Condos and HOAs add a layer
On top of county permits, condos and HOAs have their own alteration approvals — applications, insurance certificates, work-hour rules. We handle both tracks in parallel so neither delays your project.
Ready for a safer bathroom?
Call (407) 434-9297 or send the form. Ask us about a remodel with the paperwork handled — the safety visit and the written price are free, and there is never any pressure.